Public Meeting Planned For Cave Rock Project

koh-no-24-news

N-Dot will host a public meeting today, to provide construction details of an upcoming project to enhance safety on U.S. 50 in the Cave Rock area. The project, to be constructed this summer, will extend the westbound, lakeside Cave Rock tunnel entrance. The new 60-foot long and 27-foot tall structure will extend the existing tunnel to enhance safety, by catching rock fall before it reaches the roadway. The public hearing will be held from 4 to 7 p.m. at Zephyr Cove Elementary School multipurpose room at 226 Warrior Way, on a “drop in” basis, with an informational presentation at 5:30 p.m.