Drivers can expect up to 20-minute travel delays on the US 50-U.S. 95 Alternate , between Silver Springs and Fernley. N-DOT is beginning heavy construction on a project to repave and add passing lanes to the road. Single-lane traffic with a flagger and pilot car will periodically be in place weekdays primarily between 8AM and 4:30PM through early fall. About 11 miles of Alternate U.S. 95 are being repaved between U.S. 50 in Silver Springs and Royal Oaks Drive south of Fernley. The approximately $7.6 million project by A&K Earth Movers, Inc., is designed to improve the highway for the nearly 5,000 drivers who travel it daily.