Periodic single lane and shoulder closures will be in place through fall on Alternate U.S. 95 north of Silver Springs, as N-DOT repaves and adds passing lanes to the highway. Now through late fall, periodic lane and roadway shoulder closures will take place on Alternate U.S. 95 between Silver Springs and Fernley. Approximately 11 miles of Alternate U.S. 95 will be repaved between U.S. 50 in Silver Springs and Royal Oaks Drive.